Our leadership and know-how in the natural gas industry allows us to integrate the links of its entire value chain, from the wellhead to the transportation and distribution systems.
Midstream
Services provided
Value Creation
We create synergies and offer differential value to our producers and clients through treatment, conditioning, compression, operation, and maintenance services.
Catchment
The Vaca Muerta Gas Pipeline runs through 30 productive areas until the connection with the trunk systems in Planta Tratayén, transporting gas and condensed liquids to the Treatment Plant.
Measurement and regulation of gas captured prior to entering treatment plant facilities
Treatment
Application of processes required in Gas Plants to meet the quality specifications in the output gas in order to be able to inject it into the gas pipelines (mains or intermediate intake). At the same time, achieve the quality of the recovered liquids so that they can be dispatched as a final product to each client.
Compression
Provision of own equipment, with operation and maintenance, for compression both in collection systems as well as the residual gas coming out of treatment plants
in the heart of Vaca Muerta
182 Km catchment gas pipeline
conditioning, compression and treatment
3 Plants in Neuquén
injection capacity
60 MM m³
Our presence in Neuquén
Río Neuquén
Dedicated to the compression and conditioning of the gas produced in the gas field of the same name, our Río Neuquén Plant has a current capacity of 5.0 MMm3 / d. It has the capacity to inject gas in the Neuba I regulated transportation system (tgs), with production and dispatch of Gasoline.
Our presence in Neuquén
Tratayén
Strategically located in the heart of Vaca Muerta, our plant condition the gas capted through the Vaca Muerta Gas Pipeline to then be injected into the regulated transportation systems. It has a current capacity of 14 MMm3 / d with production and dispatch of gasoline.
Our presence in Neuquén
Plaza Huincul
Located in the province of Neuquén, our plant has the capacity for Compression and Conditioning of gas produced in deposits in the Cutral Có-Plaza Huincul-Challacó area. Its current capacity is 0.8 MMm3 / d. Gas injection is carried out in the Neuba I regulated transportation system (tgs) being the head of the Cordillerano Gas Pipeline, with production and dispatch of Gasoline.
Our presence
Vaca Muerta
Learn more about the investments made in the world's second largest gas reserve
Midstream
Services Provided
TGS in Vaca Muerta – June 2020
TGS – The First Midstream Operator in Vaca Muerta
Tratayén Plant: We Keep Growing
We continue to grow in Vaca Muerta
Our Presence
News
TGS is expanding its Vaca Muerta Norte pipeline
The integrated services company will begin work to extend the Vaca Muerta Norte Pipeline by 32 km, from the Los
TGS was selected to operate and maintain the Presidente Néstor Kirchner Gas Pipeline.
The energy company was awarded the operation and maintenance of the 573 km Tratayén–Salliqueló section, whic
TGS has completed critical expansion works in Vaca Muerta.
The energy company has completed works on its two main assets in Vaca Muerta. Through an investment of USD 100 m