First Midstreamer
References in Vaca Muerta
From an investment of USD 300 million, we built a gas gathering pipeline and a gas conditioning plant in the heart of Vaca Muerta.
Our Vaca Muerta Norte and Vaca Muerta Sur pipeline systems have a length of 182 km and traverse over 30 productive areas of the field with a transportation capacity of up to 60 MMm3/d.
The high-pressure pipelines extend from different productive zones in the Neuquén Basin to the Tratayén Plant, where the gas is conditioned prior to being connected to the main Neuba II and Centro Oeste trunk pipelines of the Transportation System.
Strategically located, our Tratayén Plant has a gas conditioning capacity of 14.8 MMm3/d and features gasoline production and dispatch.
We continue to grow
Vaca Muerta Norte Gas Pipeline Extension
We have started a 32 km extension of the Vaca Muerta Norte Gas Pipeline from Los Toldos I Sur to El Trapial, creating a 182 km pipeline network in the region.
This USD 60 million project increases the number of production areas served by the pipeline, allowing more Vaca Muerta gas to be injected into regulated transportation systems.
Additionally, in 2023, we doubled the capacity for condensate reception and natural gasoline stabilization at the Tratayén plant, with further expansions planned for 2023 and 2024.
Midstream
Tratayén Plant – Vaca Muerta
Tratayén Plant: We continue to grow.
We continue to grow in Vaca Muerta.
First Midstreamer in Vaca Muerta
Our Presence
Value Creation
We create synergies and offer added value to our producers and clients through services such as treatment, conditioning, compression, operation, and maintenance.
TGS has completed critical expansion works in Vaca Muerta.
The energy company has completed works on its two main assets in Vaca Muerta. Through an investment of USD 100 m
TGS was selected to operate and maintain the Presidente Néstor Kirchner Gas Pipeline.
The energy company was awarded the operation and maintenance of the 573 km Tratayén–Salliqueló section, whic
TGS is expanding its Vaca Muerta Norte pipeline
The integrated services company will begin work to extend the Vaca Muerta Norte Pipeline by 32 km, from the Los
Telcosur and Grupo Datco are enhancing connectivity in Vaca Muerta and the southern region
Telcosur, the telecommunications business unit of TGS, and Grupo Datco, a regional conglomerate specializing in